North Arrow Minerals Inc.
North Arrow Minerals Inc. North Arrow Minerals Inc.
Nebbish Project
Location:
--
:Show image 'Nebbish' in New Window:
--
Nebbish
325 KB, approx. 1 minute, 1 second at 56.6Kbps
The Nebbish Project is located approximately 70 km southeast of the Diavik Diamond mine and 340 km northeast of Yellowknife.

Size:
The Nebbish Project consists of 2 mineral claims with a combined total of 1,156 hectares.

Ownership:
100% North Arrow.

Highlights:
  • Contains the Big Bird lithium rich pegmatite dike.
  • Rock sawn channel samples collected at ten locations along a 1,100 m strike length of the Big Bird dike returned assays ranging from 0.57% Li2O to 3.13% Li2O.
Summary:
The Nebbish project contains the large lithium rich Big Bird pegmatite dike. The dike is northwest trending and is intermittently exposed along a strike length of over 1,200 m with observable widths up to 40 m. Mineralization consists of spodumene associated with feldspar and quartz. Outcrop exposure represents the interpreted centre of the dike. Marginal portions of the pegmatite and its contacts with adjacent country rocks are covered by overburden and water. A total field magnetic survey is planned for the fall of 2008. Magnetic susceptibility readings of the Big Bird pegmatite are extremely low, indicating good potential for a magnetic survey to define the extent of this large pegmatite with respect to surrounding hoist rocks.

Big Bird Pegmatite Photos & Figures

--
:Show image 'Big Bird Channel Locations' in New Window:
--
Big Bird Channel Locations
77 KB, approx. 15 seconds at 56.6Kbps
--
:Show image 'Big Bird Pegmatite outcrop' in New Window:
--
Big Bird Pegmatite outcrop
281 KB, approx. 53 seconds at 56.6Kbps
--
:Show image 'Channel Sampling Example Big Bird' in New Window:
--
Channel Sampling Example Big Bird
270 KB, approx. 51 seconds at 56.6Kbps